The Noupoort Wind Farm Paving Project consisted of the installation of 1,600 m² of high-quality paving at the Noupoort Wind Farm site. The scope included ground preparation, leveling, and precise paving installation to ensure durability and long-term performance. The project was successfully completed within 5 weeks, delivered to meet the site’s operational and structural requirements.